01Create the putaway task from receipt
Link receipt, transfer or return reference; task ID; source staging location; product and package identity; unit; quantity; condition and status. Confirm whether inspection or quarantine is complete. Do not create available-stock putaway for units still awaiting acceptance. Record mixed pallets and nested cartons so the task reflects what can actually be scanned or counted.
02Validate destination rules
Check location type, capacity, weight, dimensions, security, temperature, hazard or incompatibility, ownership, customer restriction, expiry rotation and picking profile. Confirm the bin is active and belongs to the correct warehouse and zone. A system suggestion should be treated as a rule result to verify, not permission to exceed physical or policy limits.
03Verify identity before movement
Scan or read package, SKU, lot or serial and source location. Compare task quantity and unit of measure. Preserve the parent-child relation when breaking a pallet or case. If label, identity or quantity differs, stop the affected line and resolve it. Moving an unidentified carton creates a location record but not trustworthy inventory.
04Confirm destination and physical placement
At the final location, verify the bin label rather than relying on memory or proximity. Place stock within load, access and segregation rules. Record object, destination, operator and time at the event. GS1 CBV describes storing as movement into or out of storage and stocking as making objects available for fulfillment; define which event changes availability in the local process.
05Protect lot, status and rotation
Keep lot, serial, expiry, condition and ownership attached to the moved quantity. Do not merge unlike lots or statuses because they share an SKU. Apply the approved rotation rule and record exceptions. Quarantine or damaged stock must not become available merely because it occupies a normal rack. Update replenishment and pick-face relationships only through authorized rules.
06Control split and failed putaway
When one task uses several bins, record quantity per destination and retain one remaining balance. For full, blocked, missing, unsafe or inaccessible locations, send an exception to an authorized alternate-location decision. Record unexpected stock and avoid moving it anonymously to make space. Keep every package visible in source, in process or destination status.
07Verify completion and accuracy
Reconcile received or issued quantity to put-away quantity, source staging remainder and destination records. Perform targeted floor-to-record and record-to-floor checks for new locations, high-value or repeated errors. Measure mislocation, unconfirmed tasks, dock-to-stock time and later pick failures. Correct master data, labels, scan design or training when the same route fails.